Tender for the Shenzhen Natural History Museum Schematic Design and architectural design Development is now open for pre-qualification application. Design teams from home and abroad are welcomed to participate in this competition.
For the Official Tender Announcement, please visit:
https://www.szjsjy.com.cn:8001/jyw/jyw/zbGongGao_View.do?ggguid=2c9e8ac270ce52c301712f6b140b78a0
Project Positioning
Shenzhen Natural History Museum aims to be leading in China and first-class in the world, interpreting the laws of natural evolution, showing “geographies of Shenzhen and ecology in the global perspective”. It is to become a natural history museum “to actively advocate science”.
Project Location
Shenzhen Natural History Museum will be located around the Yanzi Lake Area, which is the geometric center of Pingshan District, on the southeast side of downtown of Pingshan. It is close to Pingshan Central Park, library, art museum and other public service facilities. The east side is right next to a 1-kilometer-wide urban ecological corridor. The west side is adjacent to the old city center with traditional trade service. The area, filled with unique natural elements such as Yanzi Hill, Pingshan River, wetlands and forests, is important space for upgrade and transformation of Pingshan Central District.
Project Scale
Shenzhen Natural History Museum covers an area of 42,000 square meters, with a gross floor area of 100,000 square meters. Total investment is limited to 3.5 billion RMB (excluding specimen collection cost), in which construction cost is around 2.1 billion RMB. The final project scale and investment are subject to government approval.
Bidding Scope
Work scope for this project: conceptual design, schematic design and architectural design development; BIM in schematic design and architectural design development phases; Cooperate with feasibility study report, budget preparation and project approval; Review drawings of exhibition design, interior design, curtain wall and landscape design that have an impact on the overall architectural effect; Be responsible for material and sample selection of materials that have a great impact on the project. The final work scope shall be subject to the tender documents and design contract.
Tendering Schedule
Query Deadline: 2020.04.10 (Before17:00)
Clarification, Amendment and Answering Period Deadline: 2020.04.22 (Before 17:00)
Due Date of Pre-qualification application documents submission: 2020.05.06
Pre-qualification review meeting and result announcing: 2020.05.07-05.17 (TBD)
Pre-Qualification Application
1. Applicants must be domestic and overseas entities with legal business registration.
2. Consortium are permitted. One consortium shall include no more than 3 members (including the leading member). Each member of the consortium shall not further apply alone or participate by joining another consortium.
3. The consortium members shall sign the Consortium Agreement legally and specify the leading member, as well as work distribution in each design stage and their share of rights and interests.
4. Individual or teams of individuals will not be accepted.
Tender Rules
Procedure of invitation + open call (pre-qualification) is adopted for this project tender. There are Invitation Stage, Open Call and Pre-qualification Stage, Design Competition Stage and Final Evaluation Stage.
Invitees (in alphabetic order by Chinese company name):
1. Consortium: Bjarke Ingels Group A/S + CCDI
2. DOMINIQUE PERRAULT ARCHITECTE
3. Consortium: Grimshaw Architects + Urbanus + CNADRI
4. Consortium: CCTN architectural design Co. Ltd + Shenzhen AUBE Architectural Engineering Design Co., Ltd
5. Consortium: Artech Architects & Designers Limited + KRIS YAO | ARTECH
6. Consortium: SOU FUJIMOTO ARCHITECTS + HONG KONG HUA YI DESIGN CONSULTANTS (S.Z.) LTD.
Design Fee
The total design fee is RMB 53.50 million, consisting of two parts listed below:
1. Basic Design Fee: temporarily priced at RMB 40 million (maximum RMB 400/square meter). The exhibition design fee is not included.
2. The total amount of honorarium for outstanding bidders and compensation for scheme optimization, temporarily determined at RMB 13.5 million (currently calculated with highest possibility). Honorarium will be paid by the winner after the contract between winner and tenderee is signed and first payment is processed.
Honorarium
Honorarium is set up for outstanding schemes that are shortlisted.
1. In the design competition stage, 12 design teams that have not entered the final evaluation process will be compensated. Each of the invitees will be compensated RMB 1,000,000, while the shortlisted teams from open call pre-qualification review will be compensated RMB 600,000 each.
2. Among the 3 finalists, the final winner will be awarded of design contract, the other two teams will be paid honorarium for their outstanding proposals, each RMB 1.5 million.
3. The tenderee reserves the right to request the three finalists to further optimize their proposal. If so, an extra fee of RMB 300,000 will be paid to each team for the work. If no need for further work before final evaluation, such fee will not apply.
Tender Announcement and Downloading
1. The bidding announcement and follow-up Q&A and the issuance platform for the addendum documents are the Shenzhen Construction Engineering Transaction Service Network: http://zjj.sz.gov.cn/jsjy/jyxx...
2. Download the Pre-Qualification Document from the Tender Announcement Section of Shenzhen Construction Project Transaction Service Website.
3. Project homepage (sznhm.archiposition.com) will update timely with officially released information.
Tenderee and Co-Organizer
Tenderee
Engineering Design Management Center of Bureau of Public Works of Shenzhen Municipality
Co-organizer
Shenzhen Position Spatial Culture Development Co., Ltd.
Enquiry Email
competition@archiposition.com
Enquiry Hotline
Ms Chen: +86-19129915597 (Monday – Friday UCT+8 9:00—18:00)
Mr Li: +86-755-88134327 (Monday – Friday UCT+8 9:00—12:00, 14:00—18:00)